Large Scale General Contracting Project Case
1300
+万m³/h
Total Odor Removal Air Volume Of The UnderGround Sewage Plant
1500
+个
Delivery Of The Deodorization System
400
+个
Delivery Of Sludge Treatment System
15
+
Large Scale General Contracting Project Case
20
+年
Engineering Experience
Application Cases
Guangdong Guangzhou Fully Buried Water Purification Plant
Treatment Process: Biological Filter + Ionized Fresh Air
Treatment Capacity: 565,972 m³/h
Application Cases
Huizhou Sludge and Oil Sludge Silo + Plunger Pump
Four sets of 80 m³ sludge and oil sludge storage systems (including plunger pumps), along with centrifugal dewatering systems, waste liquid feeding systems, circulating water systems, and exhaust gas collection systems.
Application Cases
Sri Lanka Solid Waste Management
Processing Technology: Biological Filter + Chemical Absorption + Activated Carbon Adsorption
Processing Capacity: 198,410 m³/h
Application Cases
Wuhan General Contracting Project
Supply Scope: Wastewater Treatment System Equipment and Odor Control System