Application Cases

3300 万m³/h

Large Scale General Contracting Project Case

1300 +万m³/h

Total Odor Removal Air Volume Of The UnderGround Sewage Plant

1500 +个

Delivery Of The Deodorization System

400 +个

Delivery Of Sludge Treatment System

15 +

Large Scale General Contracting Project Case

20 +年

Engineering Experience

Application Cases

Huizhou Sludge Silo + Conveying System


Two sets of 60 m³ storage silos, one set of 60 m³ receiving silo, scraper conveyor, and other conveying equipment.

Application Cases

Xiangtan Sludge Dewatering, Storage, and Conveying System


One set of 200 m³ receiving silo, dewatering system, and conveying system

Application Cases

Yantai Sludge Silo + Odor Control Equipment


1 set of 200 m³ storage silo and odor control equipment

Application Cases

Guangzhou Sludge Silo


1 set of 100 m³ and 2 sets of 140 m³ storage silos

Application Cases

Foshan Sludge Silo


Two sets of 160 m³ storage silos

Application Cases

Shanghai Sludge Silo


Two sets of 150 m³ storage silos

Application Cases

Chongzhou Sludge Silo


4 sets of 350 m³ storage silos

Application Cases

Xiamen Sludge Silo


Two sets of 400 m³ silos

Application Cases

Wuhu Sludge Drying Warehouse + Scraper Conveyor


1 set of 100 m³ dry material silo + scraper conveyor